Southwest Arizona
The force main was producing approximately 3,000 ppm dissolved H2S on the high end. After installing the unit, H2S was reduced to almost zero.
Problem
Odor
Application
Pump / Lift Station / Wet Well
Solution
MICRO with 1 HV Nozzle
Install Date
August 6, 2019
Manufacturer's Representative
John Deogracias
Goble Sampson
(480) 220 – 2377