South Maine
It was found that the site acquires approximately 1 foot of FOG every week. A pilot study was performed, and results proved that within 5 days, FOG had decreased to minimal and continued to decrease of the following days. Upon reviewing the results of the pilot, it was determined that the NANO would be perfect for this site to eradicate FOG.
Problem
FOG
Application
Pump / Lift Station / Wet Well
Solution
NANO with 2 HV Nozzles
Install Date
February 12, 2020
Manufacturer's Representative
Mike Patrick
Maher Corporation